Some major progress was made today, Presidents Day. The upper cabinets are anchored into place, the microwave (or "Microhood" as it's actually called) is installed. Under the cabinet lights (Xenon, connectable, touch on/off/dimmer) are installed under the cabinets and inside the window paned wall cabinets (I'm excited about that!), and the back wall is being prepped to start the subway tile backsplash.
I think we can call in the countertop people to draw out the template tomorrow.
There were a couple of minor problems--mostly due to the walls or floor not being level--consequences of an old building. An extra piece of panel had to be installed between the dishwasher and the stove so that it could support the heavy countertops. The walls have to be built out with a piece of panel to even out the surface where the subway tile backsplash will be.
Everything in our apartment is covered in a layer of dust--cleaning seems futile, but we do it every weekend anyways. That said, the progress is very exciting--we can really see the kitchen coming together.
Thank you to Sarah and Griffin and Steff and Shawn for feeding us over the last 2 weeks!

No comments:
Post a Comment